Fall 2016 Construction Photos

Phase 1 building exterior block work is complete. Two-story stairwell constructed.  Exterior stucco work about 40% completed, on schedule to finish by the end of November.

LARTC 11-2016

LARTC 11-2016

LARTC

Second floor interior wall work and bondbeams are virtually finished, with final work being done on the two hallway bathrooms.  Interior stucco work is finished on the first floor and 50% complete on the second floor.

LARTC LARTC

LARTC

Six power poles with street lights have been installed from the street to the building. Main cable has been run to the transformer well. The 150 KW transformer has been installed and wired to the main switch.  Building wiring has begun.

LARTC

 LARTC LARTC